Elka – Electrical Engineering Works in Lisi

https://www.youtube.com/watch?v=KVn1qR7p3yY We are located near Lisi Lake. We are carrying out the reconstruction of the 6 kV overhead double-circuit transmission line originating from the Saburtalo 3 substation. A 6 kV cable line is being installed underground. The cable was laid in full compliance with safety standards. It was backfilled and covered with a warning tape […]

ელექტრო საინჟინრო სამუშაოები X2
Electrical Engineering Works X2

https://www.youtube.com/watch?v=RsxQbJIs9hE We are at the multi-apartment building project for Ixor Development, where we are handling thetemporary power supply for construction. Our tasks include installing SIP wire, setting up thedistribution cabinet, and establishing the grounding circuit. Once these components are in place, weprovide power to the stationary cranes. In response to the customer's request, we guarantee […]

Toyota center, Tbilisi

https://www.youtube.com/watch?v=cZg3lOUkTfk We are setting up a backup power supply for the Toyota Center in Tbilisi. A generator has been installed along with an automatic transfer switch, enabling the facility to seamlessly receive power from the generator. Additionally, once the main power is restored, the system will automatically revert to the main power source. The installation […]

The project is located on Chavchavadze Street in Sighnaghi city

The project, located on Chavchavadze Street in Sighnaghi,. We joined the “Renewed Regions” program announced by Prime Minister Irakli Gharibashvili. We installed the entire street lighting and camera power network underground and set up a grounding system. Energy-efficient lanterns and lamps were installed, illuminating the fence wall. We also installed an automatically controlled photo relay […]

Electrical Engineering Works in Shindis

https://www.youtube.com/watch?v=oJy18IOpRL0 We are finalizing the reconstruction of the 10 kV -kilovolt overhead transmission line by installing a new underground 10 kV -kilovolt cable line. This includes the installation of new metal supports and an air circuit breaker. The cable is has been enclosed in a fully corrugated tube, which was has been buried and covered […]