We are located near Lisi Lake. We are carrying out the reconstruction of the 6 kV overhead double-circuit transmission line originating from the Saburtalo 3 substation.

A 6 kV cable line is being installed underground.

The cable was laid in full compliance with safety standards. It was backfilled and covered with a warning tape on top.

After the installation of the cable line, the cable was tested and connected to the network.

Following this, dismantling works of the overhead line and the anchoring pole were carried out.